Reference Case Navodari
First DN1025 MULTI/JOINT® Installation in Romania
Project background
The pipeline supplies drinking water to several municipalities, including Navodari, Corbu, Lumina, and the Petromidia industrial zone. Demand peaks put high pressure on the network, which is compounded by its aging condition. “We live in a seasonal area where water consumption and pressure rise dramatically in summer. The age of the network forces us to act preventively” said the project manager from RAJA. This upgrade strengthens the region’s infrastructure and ensures continued, reliable supply for both residents and industry.
Selected technical solution
RAJA selected the MULTI/JOINT® 3000 Plus wide range fitting for its ability to accommodate angular and axial misalignment — essential for large-diameter connections where ideal alignment is rarely achievable. The fitting eliminates the need for concrete thrust blocks, cutting preparation time significantly. Its modular design also fits challenging working conditions. “We debated long and hard to find a connection solution that could take over angular and axial deviations while eliminating the need for massive anchoring. MULTI/JOINT® did just that” said the senior engineer Adrian Florea of RAJA. This was the first-ever installation of a DN1025 MULTI/JOINT® 3000 Plus, marking a key advancement in Romanian water infrastructure.
Achieved improvement
Using the MULTI/JOINT® 3000 Plus reduced installation time by over 30% compared to traditional methods — minimizing both water loss and customer downtime, adopting the safest and fastest solution. The team’s prior experience with MULTI/JOINT® installations helped ensure smooth execution — even at this larger scale. “Although this was a first at this scale, the technology gave us a smooth installation and high confidence in the long-term performance” the RAJA team confirmed.
Please accept all cookies to view the youtube video content.