Basement Distribution

In the basement distribution drinking water is handed over from utility and prepared for consumption in the building. The specific requirements and starting condition require case-related pressure reduction, filtration of suspended solids, descaling, softening and partition into individual building sectors.

62_kellerverteilung

Alupex

JRG Valves

JRG Sanipex MT

INSTAFLEX BIG

close
Alupex

Alupex

Multilayer piping system for usage in water supply applications

More Products in our Online Catalog
close
JRG Valves

JRG Valves

Safe and reliable valves for regulation of flow volume, safety valves and thermal mixers

More Products in our Online Catalog
close
JRG Sanipex MT System

JRG Sanipex MT

The 100% zero-static piping system for highest hygiene requirements

More Products in our Online Catalog
close
instaflex_big

INSTAFLEX BIG

State-of-the art polybutene system for installations in the building technology and marine sector

More Products in our Online Catalog

Main Benefits

  • Safety Use of corrosion-free and hygienic advantageous materials
  • Simplicity Modular system solution with comprehensive range of accessories
  • Efficiency Minimized number of connections and large pipe clamp intervals
  • Environment Longer operation time and lower environmental impact compared to metal systems

Talk with our experts

Would you like more information?

Please contact us

Your Contact

Mr. Shashank Sawant
Georg Fischer Piping Systems Pvt Ltd.
Prabhat Bhavan, 2nd floor, 96, L.B.S Marg
400 083 Vikhroli (West), Mumbai
India

shashank dot sawant #at# georgfischer dot com